556

for outlays of capital on the

preliminary works in connection

with the present Naval Yard Extension £2,150,000

Contractors monthly running expenses

during

the time the proposed change is

under consideration:

£5000 per month for 6 months

£30,000.

(Note cost of Installation of Blockeford is

not included as

it is of no capital Falue for Dockyard purposes.

£12,000,000

loss will be incurred)

Estimated cost of dredging

for 1,250,000 c.ft. at 12 cents per c. ft.

(Allowing a depth of 30 ft. for foundation)

Estimated cost of refitting Yard Machinery

Ditto Removal of Stores

Compensation to Admiralty for

extra expenses incurred for Superintendence

at Houghtons

Ditto Purchase of Land

Ditto

Widening

Queen's Road

Ditto Other Works in connection

with Extension

Permanent Work executed to

30th April.

£ 44,000 10,000 2,500 36, 8,000 15,000 9,500 13,000 £ 418,000

J. Owen Ordish

Supt. Civil Engineer

24.5.1901.

Edit History

2026-05-31 19:12:48 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
556 for outlays of capital on the preliminary works in connection with the present Naval Yard Extension £2,150,000 Contractors monthly running expenses during the time the proposed change is under consideration: £5000 per month for 6 months £30,000. (Note cost of Installation of Blockeford is not included as it is of no capital Falue for Dockyard purposes. £12,000,000 loss will be incurred) Estimated cost of dredging for 1,250,000 c.ft. at 12 cents per c. ft. (Allowing a depth of 30 ft. for foundation) Estimated cost of refitting Yard Machinery Ditto Removal of Stores Compensation to Admiralty for extra expenses incurred for Superintendence at Houghtons Ditto Purchase of Land Ditto Widening Queen's Road Ditto Other Works in connection with Extension Permanent Work executed to 30th April. £ 44,000 10,000 2,500 36, 8,000 15,000 9,500 13,000 £ 418,000 J. Owen Ordish Supt. Civil Engineer 24.5.1901.
Baseline (Original)
556 for outlays of capital on the preliminary works in connection with the present Naval Yard Extension 2.150,000 Contractors monthly running expenses during the time the proposed change is under consideration: month for 6 months Ray £5000 for 30,000. (Note cost of Installation of Blockeford is not included as تا ہے Falue of Buildings Dockyard hurposes. 12,000,000 loes will be incurred) une d for c.ft. at 12 cents per c. ft. (Allowing a depth of so ft. for foundation) betimated cost of refining Yard Machinery Ditte Removal of Stores Compensation to Admiralty for befeuses incurred for Superintendence ut Houghtong Ditte Purchase of Land Dette Widening Queen's Road Ditte Other Works in connection with Extension Permanent Work executed to soth April. 14 44,00-0 10,000 2,500 36, 8,000 00-0 15,000 9.500 13,000 £ 418,000 Ja). Owen Ordish Supt. livil Engineer 24.5.1901.
2026-05-31 19:12:48 · Baseline
View content

556

for outlays of capital on the

preliminary works in connection

with the present Naval Yard Extension 2.150,000 Contractors monthly running expenses

during

the time the proposed change is

under consideration:

month for 6 months

Ray

£5000 for

30,000.

(Note cost of Installation of Blockeford is

not included as

تا ہے

Falue of Buildings Dockyard hurposes.

12,000,000

loes will be incurred)

une d

for

c.ft. at 12 cents per c. ft.

(Allowing a depth of so ft. for foundation) betimated cost of refining Yard Machinery

Ditte Removal of Stores

Compensation to Admiralty for

befeuses incurred for Superintendence

ut Houghtong

Ditte Purchase of Land

Dette

Widening

Queen's Road

Ditte Other Works in connection

with Extension

Permanent Work executed to

soth April.

14 44,00-0

10,000

2,500

36,

8,000

00-0

15,000

9.500

13,000

£ 418,000

Ja). Owen Ordish

Supt. livil Engineer

24.5.1901.